Basslink integrated impact assessment statement: Potential effects of changes to hydro power generation. Appendix 7: Gordon River macroinvertebrate and aquatic mammal assessment
Davies, PE and Cook, LSJ (2001) Basslink integrated impact assessment statement: Potential effects of changes to hydro power generation. Appendix 7: Gordon River macroinvertebrate and aquatic mammal assessment. Project Report. Hydro Tasmania, Hobart. AbstractThis report addresses environmental issues associated with instream aquatic fauna of the Gordon River
as they pertain to Basslink, focusing on macroinvertebrates and platypus. It describes the current
condition of the aquatic fauna of the Gordon River, as well as management issues pertaining to the
aquatic ecosystem which result from current operations of the Gordon Dam and power station, and
potential future operational conditions that may result under a Basslink 480 MW cable scenario. It
then describes possible mitigation measures and their potential to reduce risks to instream biota and
habitats under Basslink. | Item Type: | Report (Project Report) |
|---|
| Keywords: | Basslink, mammals, fauna, Gordon River, Tasmania, hydro power, power stations, downstream |
|---|
| ID Code: | 416 |
|---|
| Deposited By: | utas eprints |
|---|
| Deposited On: | 24 Nov 2006 |
|---|
| Last Modified: | 19 Sep 2012 10:25 |
|---|
| ePrint Statistics: | View statistics for this ePrint |
|---|
Repository Staff Only: item control page
|