Library Open Repository

Sustainable Rivers Audit (SRA). Implementation Period 1(2004-2005). Progress Report: A Report to the Murray-Darling Basin Ministerial Council prepared by the Independent Sustainable Rivers Audit Group

Downloads

Downloads per month over past year

Davies, PE and Harris, J and Hillman, T and Walker, K (2006) Sustainable Rivers Audit (SRA). Implementation Period 1(2004-2005). Progress Report: A Report to the Murray-Darling Basin Ministerial Council prepared by the Independent Sustainable Rivers Audit Group. Technical Report. Murray Darling Basin Commission, Canberra.

[img] PDF
SRA_IP1_SummaryReportFinal.pdf | Request a copy
Full text restricted
Available under University of Tasmania Standard License.

Abstract

This document summarises the Independent Sustainable Rivers Audit Groups (ISRAG) main findings from the sampling conducted during the SRA’s Implementation Period 1 (2004-05), or IP1. The initial results are described from the first round of sampling of fish and macroinvertebrates from the subset of river valleys sampled in 2004-05. It should be noted that these results are preliminary. SRA Annual Implementation Reports, as distinct from 3-yearly SRA Reports, are not intended to provide final assessments. Results of more detailed and comprehensive analyses, for all Basin valleys, will be presented in ISRAG’s triennial SRA Reports.

Item Type: Report (Technical Report)
Keywords: MDBC, Murray Darling Basin Commission, Australia, river audit, freshwater, river health, ecology
Publisher: Murray Darling Basin Commission
Date Deposited: 27 Nov 2006
Last Modified: 18 Nov 2014 03:12
URI: http://eprints.utas.edu.au/id/eprint/431
Item Statistics: View statistics for this item

Repository Staff Only (login required)

Item Control Page Item Control Page