Headquarters Road Dam - Environmental Flows Assessment

Downloads

Downloads per month over past year

Davies, PE (2004) Headquarters Road Dam - Environmental Flows Assessment. Project Report. DPIWE, Hobart.

[img]
Preview
PDF
Hquaters_Rd_EFlows_report.pdf | Download (379kB)
Available under University of Tasmania Standard License.

Abstract

The following document details an environmental flows analysis conducted for the proposed Headquarters Road dam in the upper Great Forester River catchment. The location of the dam and key sites is shown in Figure 1. The construction and operation of the proposed dam, coupled with the delivery of irrigation demand via the river channel, will affect the flow regime in the lower reaches of a tributary adjacent to Headquarters Road ('Headquarters Rd Creek') and the upper Great Forester River downstream of Springfield. The environmental flows (EFlows) analysis presented here was conducted using the approach developed by Freshwater Systems and DPIWE over the last 10 years, with both a set of monthly minimum flows and a minimum set of high/flood flow events (e.g. see Davies and Warfe 2002, Davies et al. 2002). This EFlow regime was developed in a manner consistent with the newly proposed framework in the draft Water Management Amendment Bill (2004) for assessment of environmental water requirements (EWR's), such that: 1. Environmental values are identified for the upper Great Forester; 2. Environmental objectives can be identified; 3. An EFlow regime is identified which can maintain the relevant values.

Item Type: Report (Project Report)
Keywords: freshwater, environmental flows, Tasmania, dam proposal
Publisher: DPIWE
Date Deposited: 28 Nov 2006
Last Modified: 18 Nov 2014 03:12
URI: http://eprints.utas.edu.au/id/eprint/442
Item Statistics: View statistics for this item

Repository Staff Only (login required)

Item Control Page Item Control Page