Number of items: 97.
Davies, PE (2009) It's thumbs up for streams. The Mercury . p. 9. ISSN 1039-9992
Smith, BJ and Davies, PE and Munks, SA (2009) Changes in benthic macroinvertebrate communities in upper catchment streams across a gradient of catchment forest operation history. Forest Ecology and Management, 257 (10). pp. 2166-2174. ISSN 0378-1127
Likens, GE and Walker, KF and Davies, PE and Brookes, J and Olley, J and Young , W and Thoms, M and Lake, PS and Gawne, B and Davis, J and Arthington, A and Thompson, R and Oliver, RL (2009) Ecosystem science: toward a new paradigm for managing Australia’s aquatic ecosystems. Marine and Freshwater Research, 60 . pp. 271-279.
Davies, Samuel and Driessen, Michael and Davies, PE (2008) Edge and disturbance effects on forest floor invertebrates in two Hobart urban reserves. The Tasmanian Naturalist, 130 . pp. 26-36. ISSN 0819-6826
Davies, PE (2008) Sustainable Rivers Audit (SRA) Report 1 2008: Challenges and Results. In: Presentation to NWC and DEWHA, Sept-Oct 2008, Canberra, ACT.
Davies, PE and Hillman, T and Harris, J and Walker , K (2008) The Sustainable Rivers Audit (SRA): River Health Check. Report 1, May 2008. Prepared by the Independent Sustainable Rivers Audit Group for the Murray– Darling Basin Ministerial Council. Technical Report. Murray–Darling Basin Commission, ACT.
Davies, PE and Harris, J and Hillman, T and Walker, K (2007) Sustainable Rivers Audit Implementation Period 2 (2005–06) Summary Report. Technical Report. Murray Darling Basin Commission, Canberra.
Davies, PE (2007) AusRivAS: its utility, possible future governance and funding arrangements - Report to Department of the Environment and Water Resources. Technical Report. Department of the Environment and Water Resources (DEW) Canberra and Freshwater Systems, Hobart.
Davies, PE (2007) Bayesian Decision Networks for Management of High Conservation Assets (National Water Initiative – Australian Government Water Fund. Report 6/6 Report to the Conservation of Freshwater Ecosystem Values Project, Water Resources Division, Department of Primary Industries and Water). Technical Report. DPIWE, Hobart and Freshwater Systems, Hobart.
Davies, PE and Cook, LSJ and Sloane, T and Koehnken, L and Barker, P (2007) Conservation of Freshwater Ecosystem Values (CFEV) Validation Report (National Water Initiative – Australian Government Water Fund. Report 1a/6 Report to the Conservation of Freshwater Ecosystem Values Project, Water Resources Division, Department of Primary Industries and Water). Technical Report. DPIWE, Hobart and Freshwater Systems and Associates, Hobart.
Davies, PE and Cook, LSJ and Sloane, T and Koehnken, L and Barker, P (2007) Conservation of Freshwater Ecosystem Values (CFEV) Validation Report – Appendices (National Water Initiative – Australian Government Water Fund. Report 1b/6 Report to the Conservation of Freshwater Ecosystem Values Project, Water Resources Division, Department of Primary Industries and Water). Technical Report. DPIWE, Hobart and Freshwater Systems and Associates, Hobart.
Davies, PE and Cook, LSJ and Sloane, T and Koehnken, L and Barker, P (2007) Macquarie River (including Brumbys Creek and Lake River) Catchment: High Conservation Value Asset Descriptions Report (National Water Initiative – Australian Government Water Fund. Report 2/6 Report to the Conservation of Freshwater Ecosystem Values Project, Water Resources Division, Department of Primary Industries and Water). Technical Report. DPIWE, Hobart and Freshwater Systems and Associates, Hobart.
Davies, PE and Cook, LSJ and Sloane, T and Koehnken, L and Barker, P (2007) Meander River Catchment: High Conservation Value Asset Descriptions Report (National Water Initiative – Australian Government Water Fund. Report 3/6 Report to the Conservation of Freshwater Ecosystem Values Project, Water Resources Division, Department of Primary Industries and Water). Technical Report. DPIWE, Hobart and Freshwater Systems and Associates, Hobart.
Davies, PE and Cook, LSJ and Sloane, T and Koehnken, L and Barker, P (2007) Montagu and Welcome River Catchments: High Conservation Value Asset Descriptions Report ( National Water Initiative – Australian Government Water Fund. Report 5/6 Report to the Conservation of Freshwater Ecosystem Values Project, Water Resources Division, Department of Primary Industries and Water). Technical Report. DPIWE and Freshwater Systems and Associates, Hobart.
Davies, PE and Cook, LSJ and Sloane, T and Koehnken, L and Barker, P (2007) South Esk River Catchment: High Conservation Value Asset Descriptions Report (National Water Initiative – Australian Government Water Fund. Report 4/6 Report to the Conservation of Freshwater Ecosystem Values Project, Water Resources Division, Department of Primary Industries and Water). Technical Report. DPIWE, Hobart and Freshwater Systems and Associates, Hobart.
Davies, PE (2007) Collioure: Seaside village takes you back to another place in time. Australian Senior Traveller (September). pp. 4-7.
Macdonald, J and Davies, PE (2007) Improving the upstream passage of two galaxiid fish species through a pipe culvert. Fisheries Management and Ecology, 14 . pp. 221-230.
Davies, PE and Munks, SA and Cook, LSJ and Von Minden, P and Wilson, D (2007) Mapping suitability of habitat for the giant freshwater crayfish, Astacopsis gouldi: background document to GIS mapping layer: Scientific Report 4. Technical Report. Freshwater Systems and Forest Practices Authority, Hobart.
Gooderham, J and Barmuta, LA and Davies, PE (2007) Upstream heterogeneous zones: small stream systems structured by a lack of competence? Journal of the North American Benthological Society, 26 (3). pp. 365-374.
Davies, PE and Cook, LSJ and Sloane, T (2006) Effect of fire on Buttongrass Pond Ecology at Derwent Bridge. Interim report. Project Report. Freshwater Systems, Hobart.
Davies, PE and Harris, J and Hillman, T and Walker, K (2006) Sustainable Rivers Audit (SRA). Implementation Report 2006: Implementation Period 2 (IP2 2005-2006). Prepared by the Independent Sustainable Rivers Audit Group (ISRAG) for presentation to the Murray-Darling Basin Ministerial Council, November 2006. Technical Report. Murray Darling Basin Commission, Canberra.
Koch, N and Munks, SA and Utesch, M and Davies, PE and McIntosh, P (2006) The platypus Ornithorhynchus anatinus in headwater streams, and effects of pre-Code forest clearfelling, in the South Esk River catchment, Tasmania, Australia. Australian Zoologist, 34 (4). ISSN 0067 2238
Davies, PE and Cook, LSJ (2006) The Biological Condition of Cox’s Creek and Cox’s Rivulet: November 2006. Report to Dorset Council. Technical Report. Freshwater Systems, Hobart.
Davies, PE and Harris, J and Hillman, T and Walker, K (2006) Sustainable Rivers Audit (SRA). Implementation Period 1(2004-2005). Progress Report: A Report to the Murray-Darling Basin Ministerial Council prepared by the Independent Sustainable Rivers Audit Group. Technical Report. Murray Darling Basin Commission, Canberra.
Davies, PE and Cook, LSJ and Sloane, T (2006) Orielton Lagoon: Changes in the benthic macroinvertebrate community between 1999 and 2005. Project Report. Freshwater Systems, Hobart.
Davies, PE and Cook, LSJ and Sloane, T (2006) Biological Condition of the Ring and Stitt Rivers: Survey of aquatic biota, Autumn 2007. Report to Zinifex, Rosebery. Project Report. Freshwater Systems, Hobart.
Davies, PE and Cook, LSJ and Sloane, T (2006) Biological Condition of the Ring and Stitt Rivers: Survey of aquatic biota, Spring 2006. Report to Zinifex, Rosebery. Project Report. Freshwater Systems, Hobart.
Davies, PE and Cook, LSJ and Sloane, T (2006) Biomonitoring of streams associated with Henty Gold Mine 2006 Report to Henty Gold Mine, Placer Dome Asia Pacific. Technical Report. Freshwater Systems, Hobart.
Davies, PE and Cook, LSJ and Munks, SA and Meggs, J (2005) Astacopsis gouldi Clark: habitat characteristics and relative abundance of juveniles. Tasforests, 16 . pp. 1-17.
Davies, PE and Cook, LSJ and McIntosh, P and Munks, SA (2005) Changes in stream biota along a gradient of logging disturbance, 15 years after logging at Ben Nevis, Tasmania. Forest Ecology and Management, 219 (2-3). pp. 132-148.
Davies, PE (2005) Derwent Estuary Coastal Catchment Initiative - Derwent River Environmental Flows Scoping Review: Issues, state of knowledge and management objectives. Technical Report. DPIWE and Freshwater Systems, Hobart.
Davies, PE (2005) Friends of the Sandy Bay Rivulet Group. Bayside Village News . p. 4.
Davies, PE and Cook, LSJ and Koehnken, L (2005) River Clyde Environmental Flow Assessment. Project Report. DPIWE, Water Management Branch, Hobart.
Davies, PE (2005) A review of the flow and flow-related habitat requirements of Tasmanian native and introduced freshwater fish. Technical Report. Freshwater Systems, Hobart.
Davies, PE and Cook, LSJ and Sloane, T (2005) Aquatic biological survey of Pencil Pine Creek: 2005. Project Report. DPIWE and Freshwater Systems, Hobart.
Davies, PE and McIntosh, P and Wapstra, M and Bunce, S and Cook, LSJ and French, B and Munks, SA (2005) Changes to headwater stream morphology, habitats and riparian vegetation recorded 15 years after pre-Forest Practices Code forest clearfelling in upland granite terrain, Tasmania, Australia. Forest Ecology and Management, 217 (2-3). pp. 331-350.
Davies, PE and Barker, P (2005) Critical ecological assets in areas of high salinisation hazard in the Tasmanian Midlands. Project Report. DPIWE, Tasmania.
Davies, PE and Long, J and Brown, M and Dunn, H and Heffner, D and Knight, R (2005) The Tasmanian Conservation of Freshwater Ecosystem Values (CFEV) framework: developing a conservation and management system for rivers. In: IRN and WWF-Australia 2005. Freshwater protected Areas: New and Exciting Tools for conserving freshwater ecosystems in Australia, 27-28 September 2004, Sydney, Australia.
Davies, PE and Cook, LSJ (2004) NW Bay River Environmental Flows: An evaluation for Kingborough Council. Project Report. Freshwater Systems, Hobart.
Ogden, R and Davies, PE and Rennie, B and Mugodo, J and Cottingham, P (2004) Review of the 1999 ACT Environmental Flow Guidelines: A report by the CRCFE to Environment ACT. Technical Report. CRC for Freshwater Ecology & Freshwater Systems, Canberra.
Davies, PE and Cook, LSJ (2004) The biological condition of Cox’s Creek and Cox’s Rivulet: November 2004. Report to Dorset Council. Project Report. Freshwater Systems, Hobart.
Davies, PE and Harris, J and Hillman, T and Walker, K (2004) Sustainable Rivers Audit Program: A six year working program for the design and implementation of the Sustainable Rivers Audit. Technical Report. Murray-Darling Basin Commission, Canberra.
Davies, PE and Cook, LSJ (2004) Juvenile Astacopsis gouldi in headwater streams - relative abundance and habitat. Project Report. Forest Practices Board, Hobart.
Davies, PE (2004) Headquarters Road Dam - Environmental Flows Assessment. Project Report. DPIWE, Hobart.
Davies, PE and Cook, LSJ (2004) Biological Survey of receiving waters for proposed wastewater discharge, Iris River. Project Report. Freshwater Systems, Hobart.
Davies, PE (2004) Final Report Project R2004: Development of a Framework for the Sustainable Rivers Audit: Appendix 4 - Fish. Review and Development of Fish Assessment Protocols. Technical Report. Cooperative Research Centre for Freshwater Ecology, Canberra ACT.
Davies, PE and Cook, LSJ (2003) Biomonitoring of the Derwent River at Derwent Bridge: 1995 - 2003. Project Report. Freshwater Systems and DPIWE, Hobart.
Davies, PE (2003) Chimney Hill Dam aquatic biota and environmental flow assessment report. Project Report. DPIWE and Freshwater Systems, Hobart.
Davies, PE (2003) Mine Project Wins. The Sunday Tasmanian . p. 9.
Davies, PE (2003) Baffling solution for our flummoxed fish. The Mercury .
Davies, PE (2003) State should focus on its rivers: water expert. The Examiner . p. 9.
Davies, PE (2002) Full stream ahead for baffled fish. The Mercury . p. 15. ISSN 1039-9992
Davies, PE and Cook, LSJ (2002) The biological condition of Cox’s Creek and Cox’s Rivulet: November 2002. Project Report. Freshwater Systems , Hobart.
Davies, PE and Crawford, CM and Wells, FA and Dunstan, PK and Mitchell, IM (2002) Environmental flow assessment of the Lower Coal River and Pitt Water Estuary. Project Report. Freshwater Systems & Tasmanian Aquaculture and Fisheries Institute, Hobart.
Davies, PE and Warfe, DM (2002) Waterhouse Community Irrigation Development: Aquatic Environmental Assessment. Project Report. DPIWE & Freshwater Systems, Hobart.
Davies, PE and Brown, K and Sloane, T and Walker, Rodney and Cook, LSJ (2002) The aquatic fauna of King Island's streams and wetlands. Project Report. Freshwater Systems, Hobart.
Davies, PE and Driessen, M (2002) Surface Water Quality in the Tasmanian World Heritage Area: Lake St Clair, Melaleuca and the Walls of Jerusalem. Project Report. DPIWE, Hobart.
Davies, PE and Warfe, DM and Parslow, JS and Telfer, D (2002) Environmental Flows for the Lower Derwent River. Project Report. Freshwater Systems, CSIRO Division of Fisheries and Oceanography, GECO consulting, Hobart.
Davies, PE and Cook, LSJ (2002) Montreal Indicator R&D: Indicator 4.1F Testing and refinement of AUSRIVAS for detection, assessment and interpretation of changes in stream biodiversity associated with forestry operations. Technical Report. Forest & Wood Products Research & Development Corporation, Australia.
Davies, PE and Cook, LSJ and Risdon, M and Walker, Rodney (2001) Stream biological research at Warra. Tasforests, 13 (1). pp. 101-107.
Davies, PE (2001) Algal beds and threatened aquatic fauna in Great Lake: Current status, responses to lake level and management recommendations. Project Report. DPIWE (Threatened Species Unit) and Hydro Tasmania, Hobart.
Davies, PE (2001) Blackman River: Woodbury Dam proposal Aquatic environmental assessment. Technical Report. DPIWE, Hobart.
Bunce, S and McIntosh, P and Davies, PE and Cook, LSJ (2001) Effects of pre-Code forest clearfelling on the geomorphology and sedimentology of headwater streams in upland granite terrain, Tasmania. In: Third Australian Stream Management Conference:, 27 - 29 August 2001, Brisbane, August.
Sudaryanti, S and Trihadinigrum, Y and Hart, B and Davies, PE and Humphrey, C and Norris, R and Simpson, J and Thurtell, L (2001) Assessment of the biological health of the Brantas River, East Java, Indonesia using the Australian River Assessment System (AUSRIVAS) methodology. Aquatic Ecology, 35 (2). pp. 135-146.
Davies, PE (2001) Water Development Plan for Tasmania: Strategic environmental issues scoping report. Technical Report. DPIWE, Hobart.
Hart, B and Davies, PE and Humphrey, C and Norris, R (2001) Application of the Australian river bioassessment system (AUSRIVAS) in the Brantas River, East Java, Indonesia. Journal of Environmental Management, 62 (1). pp. 93-100.
Davies, PE (2001) Lower Derwent Environmental Flows Current Knowledge and Gaps. Technical Report. DPIWE and Freshwater Systems, Hobart.
Davies, PE (2001) River health expert questions Liberal irrigation plan: Doubt on Derwent dam. The Mercury . p. 9.
Davies, PE and Cook, LSJ (2000) Biomonitoring of the Derwent River at Derwent Bridge: 1995 - 2000. Project Report. Freshwater Systems and DPIWE Hobart, Hobart.
Davies, PE (2000) Cage Culture of Salmonids in Lakes: Best practice and risk management for Tasmania. Technical Report. Inland Fishereis Serviece & Freshwater Systems, Hobart.
Davies, PE (2000) Chapter 8: Development of a national river bioassessment system (AUSRIVAS) in Australia. In: Assessing the biological quality of freshwaters: RIVPACS and other techniques. Freshwater Biological Association, Cumbria, UK, pp. 113-124. ISBN 0 900386 62 2
Davies, PE (2000) Clyde River Environmental Flows: IFIM Evaluation of Minimum Flows. Project Report. Freshwater Systems, Hobart.
Davies, PE and Cook, LSJ and Risdon, M (2000) Toxicological evaluation of acid mine drainage waste water treatment options at Mt Lyell, Tasmania: Mount Lyell Acid Drainage Remediation Program,. Project Report. DPIWE, Hobart.
Davies, PE and Cook, LSJ (1999) The Influence of changes in flow regime on aquatic biota and habitat downstream of hydro electric dams and power stations in Tasmania. Project Report. Electricity Supply Association of Australia (ESAA), Canberra.
Davies, PE (1999) Forest Practices Code: Review of Soil and Water Provisions. Technical Report. Forest Practices Board, Hobart.
Livingston, A and Davies, PE (1998) Impact of critical flow events on biota of regulated streams. Technical Report. Land and Water Australia and Freshwater Systems, Canberra.
Davies, PE and Kalish, SR (1994) Influence of river hydrology on the dynamics and water quality of the upper Derwent Estuary, Tasmania. Australian Journal of Marine and Freshwater Research, 45 (1). pp. 109-130.
Davies, PE and Nelson, M (1994) Relationships between riparian buffer widths and the effects of logging on stream habitat, invertebrate community composition and fish abundance. Australian Journal of Marine and Freshwater Research, 45 (7). pp. 1289-1305.
Davies, PE and Cook, LSJ and Barton, JL (1994) Triazine herbicide contamination of Tasmanian streams: Sources, concentrations and effects on biota. Australian Journal of Marine and Freshwater Research, 45 (2). pp. 209-226.
Davies, PE and Nelson, M (1993) The effect of steep slope logging on fine sediment infiltration into the beds of ephemeral and perennial streams of the Dazzler Range, Tasmania, Australia. Journal of Hydrology, 150 . pp. 481-504. ISSN 0022-1694
Davies, PE and Cook, LSJ (1993) Catastrophic macroinvertebrate drift and sublethal effects on brown trout, Salmo trutta, caused by cypermethrin spraying on a Tasmanian stream. Aquatic Toxicology, 27 . pp. 201-224.
Davies, PE (1989) Relationships between habitat characteristics and population abundance for brown trout, 'Salmo trutta L.', and blackfish, 'Gadopsis marmoratus Rich.', in Tasmanian streams. Australian Journal of Marine and Freshwater Research, 40 . pp. 341-359.
Davies, PE (1988) Commission to examine catches. The Advocate .
Harris, GP and Davies, PE and Nunez, M and Meyers, G (1988) Interannual variability in climate and fisheries in Tasmania. Nature, 333 . pp. 754-757.
Davies, PE (1988) Disappearance rates of chlorothalonil (TCIN) in the aquatic environment. Bulletin of Environmental Contamination and Toxicology, 40 (3). pp. 405-409. ISSN 0007-4861 (Print) 1432-0800 (Online)
Davies, PE and Sloane, RD and Andrew, J (1988) Effects of hydrological change and the cessation of stocking on a stream population of Salmo trutta L. Australian Journal of Marine and Freshwater Research, 39 (3). pp. 337-354.
Davies, PE (1987) Physiological, anatomic and behavioural changes in the respiratory system of Salmo gairdneri Rich. On acute and chronic exposure to chlorothalonil. Comparative Biochemistry and Physiology C, 88 (1). pp. 113-119.
Davies, PE (1986) Extensive report taps secrets of Great Lake trout. The Mercury . ISSN 1039-9992
Davies, PE and Sloane, RD (1986) Validation of aging and length black-calculation in rainbow trout, Salmo gairdneri Rich., from Dee Lagoon, Tasmania. Australian Journal of Marine and Freshwater Research, 37 (2). pp. 289-295.
Davies, PE (1985) Scientists work to breed a superfish. The Examiner . p. 6.
Davies, PE and White, RWG (1985) The toxicology and metabolism of chlorothalonil in fish. 1. Lethal levels for Salmo gairdneri, Galaxias maculatus, G. truttaceus and G. auratus and the fate of super(14)C-TCIN in S. gairdneri . Aquatic Toxicology, 7 (1-2). pp. 93-105.
Davies, PE (1985) The toxicology and metabolism of chlorothalonil in fish. 2. Glutathione conjugates and protein binding. Aquatic Toxicology, 7 . pp. 265-275.
Davies, PE (1985) The toxicology and metabolism of chlorothalonil in fish. 3. Metabolism, enzymatics and detoxication in Salmo spp. and Galaxias spp. Aquatic Toxicology, 7 (4). pp. 277-299.
Davies, PE (1985) The toxicology and metabolism of chlorothalonil in fish. 4. Zinc co-exposure and the significance of metallothionein in detoxication in Salmo gairdneri . Aquatic Toxicology, 7 (4). pp. 301-306.
Bremmer, JB and Browne, EJ and Davies, PE and Thuc, LV (1980) The Meisenheimer rearrangement in heterocyclic synthesis. I. Synthesis of some tetrahydro-2,3-benzoxazepines. Australian Journal of Chemistry, 33 (4). pp. 833-841.
Bremmer, JB and Browne, EJ and Davies, PE and Raston, CL (1980) The Meisenheimer rearrangement in heterocyclic synthesis. II. Synthesis and X-ray crystal structure of a tetrahydro-1H-2,3-benzoxazocine and preparation of a hexahydro-2,3-benzoxazonine. Australian Journal of Chemistry, 33 (6). pp. 1323-13334.
Bremmer, JB and Browne, EJ and Davies, PE (1980) The Meisenheimer rearrangement in heterocyclic synthesis. III. Derivatives of the 1H-[1,2]oxazepino[6,5-b]indole, thieno[2,3-e][1,2]oxazepine and [l]benzothieno[3,2-e][1,2]. Australian Journal of Chemistry, 33 (6). pp. 1335-1343.
This list was generated on Sun Nov 8 04:11:13 2009 EST.