Open Access Repository

Basslink Monitoring Program Field Report Gordon River Macroinvertebrates Spring and Autumn Report 2013/14

Downloads

Downloads per month over past year

Davies, PE and Cook, LSJ (2014) Basslink Monitoring Program Field Report Gordon River Macroinvertebrates Spring and Autumn Report 2013/14. Project Report. Freshwater Systems, Hobart.

[img]
Preview
PDF
Gordon_1314_mac...pdf | Download (14kB)
Available under University of Tasmania Standard License.

Abstract

Macroinvertebrates were sampled in spring (November) 2013 and autumn (March) 2014 at nine sites in the Gordon River between the Gordon power station and the Franklin River junction. Six reference sites were again sampled in the Franklin, Denison, Maxwell and Jane Rivers.
Sampling was conducted as required under the Basslink Monitoring Program, with all sites sampled using:
- Quantitative surber samplers with 10 sample units taken per site placed randomly in mid-riffle habitats; and
- Rapid bioassessment (RBA) kick sampling, with live-picking on-site

Item Type: Report (Project Report)
Publisher: Freshwater Systems
Additional Information:

© Hydro Tasmania 2014, © Freshwater Systems 2014

Date Deposited: 03 Jul 2014 06:49
Last Modified: 18 Nov 2014 05:02
Item Statistics: View statistics for this item

Actions (login required)

Item Control Page Item Control Page
TOP