Open Access Repository

The trial load analysis of Clark dam, Butler's Gorge, Tasmania

Downloads

Downloads per month over past year

Whitham, LS (1948) The trial load analysis of Clark dam, Butler's Gorge, Tasmania. Unspecified thesis, University of Tasmania.

[img]
Preview
PDF (Whole thesis)
whole_WhithamLi...pdf | Download (68MB)
Available under University of Tasmania Standard License.

| Preview

Abstract

This paper describes the application of the
Trial Load Method to the analysis of Clark Dam, a
unit of the Tarraleah Development built and operated
by The Hydro Electric Co.mmission of Tasmania.
Samples of the actual calculation forms used are
included and the methods of computation are explained.
The final analysis of the dam as constructed
is presented with specimen computations,
and the remainder suitably condensed and tabulated.

Item Type: Thesis (Unspecified)
Keywords: Dams, Clark Dam (Tas.)
Copyright Information:

Copyright 1948 the author - The University is continuing to endeavour to trace the copyright owner(s) and in the meantime this item has been reproduced here in good faith. We would be pleased to hear from the copyright owner(s).

Additional Information:

Thesis (M.E.)--University of Tasmania, 1948

Date Deposited: 04 Feb 2015 23:20
Last Modified: 04 Oct 2016 21:25
Item Statistics: View statistics for this item

Actions (login required)

Item Control Page Item Control Page
TOP